Fresh concrete

Slump test (workability)

Measures the consistency of concrete of medium to high workability; the most common site control test.

Standards:IS 1199 (Part 2):2018 — consistency of fresh concreteIS 456 cl. 7.1 — recommended workability

Equipment

  • Slump cone (frustum) — bottom 200 mm, top 100 mm, height 300 mm, with foot pieces and handles
  • Tamping rod 16 mm diameter, 600 mm long, rounded end
  • Rigid, flat, non-absorbent base plate
  • Measuring scale
  • Scoop and trowel

Procedure

  1. Dampen the inside of the cone and the base plate; stand on the foot pieces to hold the cone firmly.
  2. Fill the cone in four layers of about equal height, rodding each layer 25 times uniformly over its cross-section, penetrating into the layer below.
  3. Strike off the top level with the rod or trowel and clean spilled concrete from around the base.
  4. Lift the cone vertically and steadily in 5–10 seconds without twisting.
  5. Immediately measure the slump as the difference between the height of the cone and the highest point of the slumped concrete. Complete the test within about 2.5 minutes.

Results and acceptance criteria

  • True slump: the concrete subsides evenly — record it. Shear slump: one side slides away — repeat; persistent shear indicates a harsh, cohesion-deficient mix. Collapse: mix too wet or a flowing mix — use the flow test.
  • IS 456 cl. 7.1 guidance: mass concrete, lightly reinforced sections, floors, strip footings 25–75 mm; heavily reinforced sections 50–100 mm; slip-form and pumped concrete 75–100 mm; trench fill and in-situ piling 100–150 mm; tremie concrete — use flow.

Practical tips

  • Test within minutes of sampling; workability drops quickly in hot weather.
  • Record slump with the delivery ticket, time and admixture dosage.

This page summarises the procedure for site and laboratory use. Follow the current edition of the cited standards (with amendments) and the project specification, which govern.